p>Integrity Ensure compliance with GE policy, procedure and regulatory requirements and ethical behaviour. Health & Safety Ensure
compliance with all Environmental Health and Safety requirements,
including but not limited to participating and assisting where
necessary with any internal or external audits, ensuring the assigned
area of work is kept to a good housekeeping standard, is clean and tidy
at the end of each day, and engagement in the GE Global Star program for
Subsea Controls. Quality Everyone
at Subsea Controls is responsible for Quality, ensuring compliance at
all times. All Company members are required to actively participate in
the various Quality forums which are the conduit towards achieving the
company’s aim of sustained Quality Improvement.
Experienced
EPC Project Management
Project Controls and Logistics
United Kingdom
Nailsea
BS48 1BS
No
Establish
and maintain adequate plans at different levels for Subsea control
system projects either as part of Integrated System (EPC) projects or as
separate delivery projects.Collect information and prepare weekly and monthly reports as required by GE or by the Client.
The planner is responsible for ensuring that:
The plan is developed to sufficient detail to ensure
effective control of all objects going into the project deliverables.
This may be achieved through sub-suppliers plans or through development
of detailed plans as required
Critical activities are identified and continuously monitored and reported to project management
Project reports reflect the real project status both w.r.t. to time and performance
Planning and reporting requirements are included in all Subcontracts and Purchase Orders
Variation orders time impact are properly managed and integrated into the plan
Describe the planning process for any product delivery projects
Identify and collect technical documentation in order to understand the project deliverables and all components.
Define sufficiently detailed logical network to define need
dates for all materials and components. The network shall include
fabrication and test activities in sufficient detail to define need
dates for materials and components. If the project is part of an
Integrated System Project this shall be done in communication with the
EPC Planner.
Together with procurement department the Project Planner
will develop a complete procurement plan including all components
defined in the scope of supply list. They will define Need Dates and
Lead Time in the procurement plan.
Based upon the Procurement Plan, the Project Planner will
develop an Engineering Plan with milestones for design freeze and
placement of Purchase orders - the plan shall include man-hour estimates
to define need for Engineering resources.
Based upon these detailed plans the Project Planner shall
update the integrated network with engineering and procurement
activities to enable effective analysis of the network.
Collect reports from the Engineering and Procurement
Department and report deviations. They will also prepare man-hours
performance reports for engineering in cooperation with cost controller.
Monitor sub-contractors plans and analyze and report
deviations. They will also prepare weekly and monthly reports as
required by Vetco Gray or the Client
Give a schedule input to Variation Orders and define/analyze cumulated effect on overall project.
Manufacturing or engineering or project management/planning background. With proven working experience.
Knowledge of the Primavera or other relevant planning system, as user.
Working experience in an industrial business.
Familiar with other GE project systems such as MRP (e.g. SAP, AS400, Oracle) and the EPiC document management system.